89
www.gateway.com
3 Fold out the handle and push the green locking lever to the right to release the power
supply module from the chassis (front or back, whichever is applicable).
4 Pull the power supply module straight out of the server with the handle.
5 Insert the new power supply module into the server, with the green locking lever to
the left, until it locks into place, then fold the handle flat.
6 Reconnect the AC power cord for the new power supply module.
7 If you added a redundant power supply module, see “Updating the FRU/SDR” on
page 37.
Locking lever
Handle
Power supply LED
8510522.book Page 89 Wednesday, March 16, 2005 11:19 AM