IBM Version 52 Computer Accessories User Manual


 
Situation Explanation/Resolution
In some cases,
perimeter services
may fail with the
following error. The
error will be recorded
in the perimeter
services log
(perimeter.log).
You can improve the situation by reducing high timeout values in
communications adapters and by increasing the delayed event
queue size (delayed.event.queue.size) in perimeter.properties file.
The default value of the delayed.event.queue.size property is
30000. You can increase the value based on your requirement.
Performance and Tuning Worksheet
The Performance and Tuning Worksheet can assist you in tuning Sterling B2B
Integrator for optimal performance.
It helps you take an inventory of the different parts of your installation that affect
performance.
Note: This worksheet is optional. It does not replace the Sterling B2B Integrator
System Requirements documentation that you used to install Sterling B2B Integrator.
Use the Performance and Tuning Worksheet to help you determine your hardware
requirements according to your processing volumes, operating system, hardware
vendor, and number of CPUs you are running.
Request Description Your Answer
How many processing days are there
in a month?
Enter the number of processing days in
a month. Use 30 days as an average.
This gives 5 days of maintenance time
throughout the year.
How many processing hours are there
in a day?
Enter the number of hours you allow
for processing all the data.
How many translations are required for
each transaction?
Enter the largest number of translations
you will have if multiple translations
are required for a business process. For
example, is data mapped to a common
format, and is the common format used
to interface with all the external
systems?
Is content-based routing required? If content-based routing is required in
your business processes, you require
maps, XML encoder, BPML choice,
assigns, adapters that are used for
routing, and possibly other
components.
Does the content of a transaction have
to be verified?
This requires translating data into
XML. The data will then have to be put
in process data and verified using
XPath.
Performance Management 241