Nortel Networks CVX 600 Switch User Manual


 
Replacing Modules and Filler Panels
3-14 296-1011-202 Rel. 5.0, Doc. Rev. 02.01
CVX 600 Hardware Installation Guide
Installing an SCC-SM
To install an SCC-SM, follow these steps:
Step Action
1 Make sure that the locking screw is in the unlocked position (slot is horizontal).
2 Ensure that the ejectors are extended at an angle, but not all of the way.
Caution: Extending the ejectors all of the way may result in ejector
breakage when attempting to close them in step 4.
CVX-0145A
Unlocked position
CVX-0213B
Ejector
at an
angle
Ejector
at an
angle
Ejector
straight
Ejector
straight