Nortel Networks CVX 600 Switch User Manual


 
Mounting the CVX 600 in a Rack
296-1011-202 Rel. 5.0, Doc. Rev. 02.01 1-9
Chassis Installation
Reference
For PTE 2000 rack installation instructions, see the PTE 2000 Installation Guide
(IM 07-08-1543).
Anchor Kits
Nortel Networks offers four types of PTE 2000 anchor kits; each kit contains two
anchors. If you do not plan to order anchor kits from Nortel Networks, you can
use other anchor kits that provide the same level of seismic protection.
The following table describes each of the anchor kits.
Note: You must use six floor anchors to secure the PTE 2000 rack to the
equipment-room floor.
Kit Number
Earthquake Zone
Compliance
Floor Type Notes
NTRU0324 Up to and including zone 4 Raised or concrete
floor
Includes M12
anchoring hardware
(2 anchors)
NTRU0328 Up to and including zone 4 Concrete floor only Includes M12
anchoring hardware
(2 anchors)
NTRU0323 Up to and including zone 2 Raised or concrete
floor
Includes 3/8 in.
anchoring hardware
(2 anchors)
NTRU0326 Up to and including zone 2 Concrete floor only Includes 3/8 in.
anchoring hardware
(2 anchors)