Nortel Networks CVX 600 Switch User Manual


 
Preparing for the CVX 600 Installation
1-16 296-1011-202 Rel. 5.0, Doc. Rev. 02.01
CVX 600 Hardware Installation Guide
Tools and Equipment Needed
Before you install the CVX 600 chassis, ensure that you have all of the necessary
tools, cables, console equipment, and mounting hardware.
Tools
You must have the following tools:
Screwdrivers:
Phillips #2 screwdriver
1/16-inch and 1/4-inch flat-tip screwdrivers
Nut drivers (nonmetric sizes) for securing power and ground cabling
Volt/ohm meter for power connections
Cables and Cable Ties
The shipment does not include the cables required for the telephone side of your
network. Ensure that the installation site has the proper network cabling.
Cable ties are needed to bundle network and power cables, to provide access to
LTM and RLTM modules.
Service Console
You can connect a local terminal or a PC to the CVX 600 to monitor startup
diagnostics and to perform manual startup and configuration. See Chapter 2,
Chassis Connections, for information on installing a service console. See the
following software manuals for information on configuring the CVX 600 access
switch:
CVX Multi-Service Access Switch Startup Guide
CVX Multi-Service Access Switch Configuration Guide