Nortel Networks CVX 600 Switch User Manual


 
Mounting the CVX 600 in a Rack
1-10 296-1011-202 Rel. 5.0, Doc. Rev. 02.01
CVX 600 Hardware Installation Guide
Space Requirements
The following table lists the PTE 2000 racks and dimensions.
Flooring Requirements
You must anchor the PTE 2000 rack to the equipment-room floor. The flooring
can be one of the following types:
Raised floor tiles, ideally with a clearance of 18 in. (45.5 cm), and a subfloor
cable management system
Bare concrete floor
Depth for Drilling
If you plan to install the PTE 2000 floor anchors on a bare concrete floor, you
must drill to the following depths:
2 in. (51 mm) for the 3/8 in. anchor (for zone 2 earthquake compliance,
NTRU0323/NTRU0326)
4 in. (103 mm) for the M12 anchor (for zone 4 earthquake compliance,
NTRU0324/NTRU0328)
Rack Type Part Number
Width in
Inches (mm)
Depth in
Inches (mm
Height in
Inches (mm)
NEBS-compliant rack NTRU0134 23.6 (600) 23.6 (600) 83.66 (2125)
ETSI-compliant rack NTRU0234 23.6 (600) 23.6 (600) 86.6 (2200)
Warning: Before you begin to drill, make sure you are familiar with the
building construction. If you plan to drill holes in a below-ground
structure, make sure that you do not drill through the concrete into the
vapor barrier. If you do, groundwater may seep through the anchor hole.