Nortel Networks CVX 600 Switch User Manual


 
Preparing for the CVX 600 Installation
296-1011-202 Rel. 5.0, Doc. Rev. 02.01 1-15
Chassis Installation
Checking the Shipment
Carefully inspect the shipment for completeness, ensuring the items in the
shipping container match those on the packing list affixed to the shipping
container. In particular:
Confirm that the shipment includes any additional cables you have ordered.
Check all items for shipping damage.
3 Remove the box containing the accessory kit and other parts. (The AC chassis
option will have two power cords. The DC chassis option will have none.)
4 Remove the packing material surrounding the chassis.
5 Using a Phillips screwdriver, remove the six screws that secure the chassis to
the pallet brackets.
6 Using a 9/16-inch wrench, remove the four bolts that secure the pallet
brackets to the pallet.
7 Remove the four pallet brackets from the pallet.
8 Carefully remove the chassis from the pallet.
Note: If you detect or suspect any damage, do not install the CVX 600
chassis. See Technical Support on page xviii.
Step Action
A
C
PM
AC PM
Fans
1
2
3
4
5
6
CVX 6oo
BIP
BIP
Filler
System
Power
G
o
od
Fai
l
ed
R
e
dun
Ethernet
HSSI
1
3
2
1
Reset
PCMCIA
1
2
System
P
o
w
e
r
G
oo
d
F
ail
e
d
R
e
d
u
n
Ethernet
HSSI
1
3
2
1
Reset
PCMCIA
1
2
DS1
Yellow Red
1
2
3
4
5
6
7
8
9
10
11
12
Power
Good
Fail
e
d
R
edun
Modem
ISDN
P
owe
r
Good
Fai
l
e
d
Re
d
un
Powe
r
G
oo
d
Faile
d
Redun
AC
PM
1
A
C PM 2
PDU 2
PDU 1
E
SD
Jack
O
I
O
I
Turn counterclockwise
to remove screws.
CVX-0221A
Turn counterclockwise
to remove screws.
Phillips screwdriver
Phillips screwdriver