FC-22 PREVENTIVE MAINTENANCE 2 - 2 January 2000 © TOSHIBA TEC
2. 2 Maintenance to be Performed
FC-22: Every 30,000, 60,000, 90,000 and 120,000 Copies
FC-15: Every 20,000, 40,000, 60,000 and 120,000 Copies
(1) Preparation
Discuss current machine conditions with the key operator and note them down.
Before starting maintenance, make a few sample copies by TCC-1 chart and save them for
later reference purposes.
Turn OFF the power switch, and be sure to unplug the copier.
(2) Perform preventive maintenance following the checklist shown below. During maintenance, refer to
the illustrations attached and the Service Manual as required.
(3) After having finished the maintenance, plug in the copier, turn ON the power switch, and make a few
copies to confirm that the copier is working normally.
2. 3 Preventive Maintenance Checklist
Symbols used in the checklist (For FC-22)
Cleaning Coating Replacing Operation check Date
A Cleaning with alcohol
Cleaning with soft pad,
cloth or vacuum cleaner
W White grease
(Molycoat)
AV Alvania No.2
30 Every 30K copies
60 Every 60K copies
90 Every 90K copies
120 Every 120K
copies
> Replace if
deformed or
damaged
After cleaning
or replacing,
check for no
abnormality.
User’s name
Serial No.
Inspector’s
name
Remarks
Symbols used in the checklist (For FC-15)
Cleaning Coating Replacing Operation check Date
A Cleaning with alcohol
Cleaning with soft pad,
cloth or vacuum cleaner
W White grease
(Molycoat)
AV Alvania No.2
20 Every 20K copies
40 Every 40K copies
60 Every 60K copies
120 Every 120K copies
> Replace if
deformed or
damaged
After cleaning
or replacing,
check for no
abnormality.
User’s name
Serial No.
Inspector’s
name
Remarks