Exatron 3000B
www.exatron.com 2-13 Chapter 2 Installation
4.
DO NOT PLUG THE HANDLER INTO THE POWER SUPPLY YET
. First plug the power supply only
into a grounded wall outlet. Turn the power supply on by pressing the red power button and verify that
the +5 volts and +24 volts are operational. If you wish to check/calibrate the power supply output,
please refer to Chapter 7, Preventive Maintenance.
5. Turn the power supply off again. Now connect the handler power cord to the power supply via the
white Molex connector.
6. If your application requires it, turn the compressed air supply on. Turn the orange switch on the air
regulator to the on position.
7. Move the octoloader plate so that it is flush against the octoloader home switch. Hold the plate in this
position until the power is on.
8. Turn the handler power on by pressing the Red power button on the power supply and observe closely
the display on the handler controller microterminal.
NOTE: Power to the Model 3000B may be turned off and then on again at virtually any time during
handler operation. The only time it is not advisable to turn the power off is within the first 10 seconds
of turning the handler on.
First you will see
VO1.01 Test Ok
displayed
,
quickly followed by your handler model number and
firmware revision date. If you have a plunge-type test assembly, the next message to be displayed
will be
JOG UP
, which tells you that the Z plunger is moving up to locate its top position switch.
The next message displayed is
MOD SET UP ? NO
.
9. Press the
[DIAGNOSTICS]
button on the handler microterminal and perform the complete set of
Diagnostic Tests on your handler and included options. These Diagnostics procedures are detailed
for you in Chapter 5 of this manual. This is your opportunity to become familiar with the handler's
controller and mechanical functions as you observe its self-testing cycles.