3Com CRWXR10095A Switch User Manual


 
What’s Next? 185
8 Click on the Objects to Place tab.
9 Click on the MAP icon, then click on the location where you installed the
MAP. The MAP icon moves from the Objects To Place tab to its location
on the floor.
What’s Next? You can create a backup copy of your updated network plan, and
distribute the updated 3WXM configuration to the WX switches.
For information about administrative tasks, see “Perform Basic
Administrative Tasks” on page 146.