ADIC Scalar 1000 Network Card User Manual


 
SNC 5100
84 Final Diagnostic Tests
6-00020-02
Step 4. Remove the rack bracket from across the width of the 19" rack by
unscrewing the two 10-32 x 5/8" screws.
Step 5. Slide the unit out of the rack.
Replacing the SNC 5100
Step 1. Remove the SNC 5100 from the protective bag.
Install the new SNC 5100 in the rack.
Step 2. Plug the power cable in.
Step 3. Complete the "Final Diagnostic Tests".
Final Diagnostic Tests
After the unit has been replaced, a complete diagnostic check must be
performed to ensure that no new problems have been introduced.
For further information about the procedures and commands used in this
section, see Connecting to the Service Port on page 95 and Diagnostic
Command Reference on page 187.
Final Test Preparation
Step 1. Connect a service terminal to the SNC 5100.
For information about how to do this, see Connecting to the
Service Port on page 95.
Step 2. Reattach the power cord to the SNC 5100.
Step 3. Turn on the SNC 5100 and wait until it finishes booting.
Step 4. Press the Enter key on the service terminal.
If the prompt is not displayed, go to Service Port MAP on
page 75.
Step 5. From the Service Terminal, enter the
diagBoot command.
Step 6. Wait until the SNC 5100 has finished booting into diagnostic mode.