Barco R59770057 Projector User Manual


 
F. Mounting optional Carry handle
A
A
A
B
B
C
Image F-2
Mounting the stacking points
2. Place a stacking point (A) in each hole.
3. For the front stacking points, turn in for each a long bolt (B). For the back stacking point, turn in a short bolt (C).
Image F-3
Stacking points mounted
F.2 Preparing the new carry handle
What has to be done?
The back stacking point must be removed before the carry handle can be mounted on the CLM projector. The xation hole for the
xation bolt of the carry handle is covered by the stacking point construction.
How to remove the stacking point construction
1. Turn out the 4 bolts, 2 on each side. Be aware that there is a nut for each bolt on the inside of the carry handle.
212
R59770057 CLM HD8 15/03/2010