5.5 Project handling
In the menu item <Network Configuration> you start the main configuration work of your
project.
5.5.1 Create a New Project
After the preliminaries you can start a new project.
Fig 5.5-1 Starting a new project
You choose <New> or <Open>.
New: The window (2) with the New Projects Dialog appears. Edit the project name and, if
desired, add a comment. Leave the window by pressing the <OK> button.
Open: You choose one of the shown projects to work with.
Fig 5.5-2 Open an existing project
!