Emerson FG-110 Computer Accessories User Manual


 
Softing Linking Device
Manual for Configuration, Installation and Maintenance
FF-CONF Configure your plant
page 66 of 85 V1.3
Copy and paste groups and applications
To realize big installation without any problem, and to record all the blocks and connections
repeatedly use the possibility to copy and paste groups and applications.
Table 5.8-1 Copy and paste groups and applications
If you copy and paste a group or an application you copy all blocks and all the connections
but there is no association of the blocks to a device. The association to destined devices
might be established during commissioning.
Each block can be used in only one application
5.8.2 Configure the Function Block application
There are 2 ways to configure a function block application:
Use the devices first approach, i.e. use the function blocks of configured devices.
Use the function block application first approach and later associate to a device. First
choose the blocks.
5.8.2.1 Devices first approach
Configure network configuration view
Change to Function Block application
You first configure the devices and use the Function Blocks on the devices for your Function
Block application.
Fig 5.8-1 The steps to choose the desired blocks
i