10.2 Cold Replacement
In cold replacement, none of the replacement work is performed with the maintenance menu
from a terminal connected to XSCF.
The procedure is as follows.
1. Unlock and open a door of the server. (See Chapter 5)
Caution – Before touching a FRU or dummy (filler) unit, see Section 1.4, “Antistatic
Precautions” on page 1-9 and be sure to wear the antistatic wrist strap. Failure to do so might
result in serious damage to operating domains.