Chapter 23 Switch Backplane Replacement 23-9
14. Use one of the following methods to start (power on) all domains at once.
■ Press and hold down (for less than four seconds) the POWER switch on the operator
panel.
■ From a console that is connected to XSCF, execute the poweron -a command of
XSCF.
The power to all the domains is turned on, and then the power-on self test (POST) is
executed. When ok prompt displayed on the console of relevant domain, POST is
completed.
For details of the power-on operation, see Section 4.4.2, “Powering the Server On” on
page 4-22, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF
User’s Guide.
15. Restore the original mode switch setting on the operator panel.
Note – When the maintenance work is completed, be sure to confirm the mode switch
setting and return the switch to Locked.
16. Close the door on the server, and lock it.