IBM C79EGMST Laptop User Manual


 
Hints, Tips, and Limitations
Using the Power Management Modes
You can select either the Resume on incoming call option or the
Hibernate X minutes after suspend option but not both. If you
select one option, the other option becomes gray and cannot be
selected.
To enable Resume on incoming call, do as follows:
1.
Start the ThinkPad Configuration program.
2.
Click on the Resume/Suspend options tab.
3.
Click on Resume on incoming call.
To enable Hibernate X minutes after suspend, do as follows:
1.
Start the ThinkPad Configuration program.
2.
Click on the Hibernation tab.
3.
Click on Hibernate X minutes after suspend.
Using a PC Card with the Docking Station
In the Windows 95, Windows NT, Windows 3.1, or DOS
environment, you need to install the PC Card support software
after
docking your computer to the docking station. If you have already
installed the PC Card support software, uninstall it and then reinstall
it after you dock your computer to the docking station.
USB Connector Considerations
For PCI Cards in the SelectaDock III Docking Station
When the setting of the USB connector on your computer is enabled
(the default setting), do not use a PCI Video Card and a PCI
Network Card at the same time in the SelectaDock III docking
station. Your system cannot start if both cards are inserted.
For the USB Connector Setting on the SelectaDock III Docking
Station
Do not disable the USB connector on the SelectaDock III. If you
disable it, the system might hang during a hot- or warm-dock or
undock operation. If this occurs, cold-boot the system for recovery.
Chapter 4. Solving Computer Problems 113
Title: C79EGMST CreationDate: 02/10/98 09:24:42