3300 ICP Hardware User Guide
112 Release 3.3
• Adequately lit
• Easily accessible.
Do not locate the system near
• Sprinkler systems, sweating pipes, steam pipes, or steam vents
• Corrosive fumes or exhaust from machinery
• Electronic equipment that generates strong radio frequency fields (such as a radio or
television receiver)
• Equipment that generates strong magnetic fields that can corrupt data on hard disks or
floppy disks
• Reproducing machines.
Parts and Equipment
In order to complete the installation, you must supply the following items:
Information and Services
In order to complete the installation, you must ensure that the
• Ethernet connection is available at the site of server (one Ethernet connection (100 Base-T)
is required if you are installing Mitel Networks IP telephones)
Note: If a reproducing or copying machine must be located in same room as the system,
ensure that it is more than 3 m (10 ft.) away from the system. If the machine is not equipped
with a filtering system, ensure that the room is ventilated by an exhaust fan.
Item Application
Computer connected to a LAN Configure and manage the system
Main Distribution Frame (MDF) Connect 25-pair peripheral cables with lines and trunks
25-pair cable with male amphenol
connectors (AMP Champ or equivalent
connectors: 50 pin RS, screw lock, 90x
tapered slide on hood)
Connect lines and trunks from the rear of the ASU to the
MDF
3 category 5 cables with RJ-45
connector (no longer than 100m)
- Standard Ethernet cable to connect to a Layer 2 switch
- Ethernet crossover cable to connect the CIM ports
- Cable from the digital trunk (NSU) and the demarcation
point has a different pinout.
Fiber optic cables Connect the 3300 Controller to digital trunks and NSUs;
terminate at the FIM ports
ST-type fiber connectors (four)
14 AWG (1.8 mm) cable (minimum) Ground the NSU and ASU
RJ-45 connector cable Provide connectivity between NSU and demarcation point
UPS Power back-up
Equipment rack (optional) Mounting components