Mitel 3300 Network Hardware User Manual


 
Install Upgrades and FRUs
Release 3.3 217
- Remove the cable by sliding it through the cable port at the rear of the cabinet.
6. Pull the FIM out gently from slot 17, unplugging it from the backplane.
Install a FIM
To install a FIM in a Peripheral Unit:
WARNING: Power must not be applied to the Peripheral Unit during the installation of
the Fiber Interface Module.
1. Attach the anti-static strap to your wrist.
2. Unpack the FIM, and inspect it to ensure that it is not damaged.
3. Slide the FIM into the bottom of slot 17 until it connects with the backplane firmly.
4. Fasten the FIM in place with the two screws provided or the latch on the card guides.
5. Attach the FIM cable by following the steps in Connect the Fiber Optic Cable.
6. If the PSC and power converter were removed, replace them at this time.
7. Power up the node.
8. Replace the front panels.
Install a Peripheral Switch Controller Card (PSC)
To replace a peripheral switch controller card:
CAUTION: This procedure takes the peripheral devices connected to the node out of
service.
CAUTION: Wear an anti-static strap whenever you handle circuit cards.
1. Power down the Peripheral Unit.
2. Replace the faulty peripheral switch controller card with the new peripheral switch con-
troller card.
3. Power up the Peripheral Unit.
Install a Dual 10Base-T Interface Assembly
To replace a Dual 10Base-T Interface Assembly
1. Remove the front panels.
2. Disconnect the Ethernet cables from port J5 on each of the Ethernet Interface (ETI) cards.
Note that disconnecting these cables disconnects access to the switch from OPS Manager
and raises an alarm on the OPS Manager station.