Paradyne 6800 Network Cables User Manual


 
Performing Migration
7-216800-A2-GN22-30 January 1997
The original menu (Figure 7-4) appears with the selected type in parentheses after
Option 3:
492-13963
AT&T Paradyne NMS Parameters:
1 Initialize ONLINE Partition y
2 Initialize NMS Database y
3 Include Migration Data (r2) y
4 Rebuild NMS Database Indices n
cont To Continue
quit To abort
If you wish to modify the NMS parameters
Enter number (1,2,3,4,cont or quit):
Figure 7-4. Original Menu Showing Selected Type (r2)
11. To rebuild the NMS database indices,
TYPE: 4
PRESS: Enter
12. To continue,
TYPE: y
PRESS: Enter
13. To continue,
TYPE: c
PRESS: Enter
The following message appears:
xxxx Data Base Initialization xxxx
followed by several console messages indicating the initialization of the INFORMIX
OnLine. Once completed, the following message appears:
xxxx Data Base Initialization Completed xxxx
The database migration consists of files/directories used with the INFORMIX
database and the INFORMIX database itself.
followed by this query:
Do you wish to migrate faults data (y or n)? [n].