Paradyne 6800 Network Cables User Manual


 
Preparing the Processors
2-76800-A2-GN22-30 January 1997
Preinstallation Checks for the Integral Ethernet Card
The Integral Ethernet Card is installed at the factory but the user should check that the settings on
the card are properly configured.
1. Check the jumper settings on the Ethernet card. Confirm that the 7-pin dip jumper is set
between U7 and U8 to set the card for Thick net transmission (see Figure 2-3).
2. Be sure that the Ethernet card is properly seated in the slot above Slot 1 and the cable is
connected to the J5 and J1 pin clusters.
U7 U8 U9
THICK THIN
J5
J1
493-14255
Figure 2-3. Integral Ethernet Card