Raritan Computer Paragon switch Switch User Manual


 
CHAPTER 2: INSTALLATION 23
Note: When following the installation and configuration instructions below, sort the
Selection Menu by Channel ID Number, not by Name. Display the menu by
pressing < F2> and change the sorting method by pressing <F12>.
Important: All Paragon components must be powered ON prior to Z-Series tier installation. All
computers in the Z-chain and all Z4200U components must be powered OFF prior to
installation.
Connect Z-Series Z4200U Z-CIMs as a Tier:
1. Connect a Category 5e UTP cable to the channel port on the Paragon switch reserved for the Z-
CIM chain.
2. Connect the other end of this Category 5e UTP cable to the UTP OUT port on a Z-CIM, which
will be the first Z-CIM in the chain.
3. Connect a computer to the first Z-CIM.
For UKVMSPD Z-CIM:
a. Connect the 6-pin mini-DIN keyboard and mouse and HD15 video connectors on the
UKVMSPD Z-CIM to computer’s keyboard, mouse, and video ports.
b. Place the Z-CIM Terminator in the Z-CIM’s UTP IN port.
c. Power ON computer.
Figure 18 Z-CIM UKVMSPD
For UKVMSC Z-CIM with local port:
a. Connect DB25 male end of CCPnn cable to DB25 female port on back of a Z-CIM (UKVMSC).
b. Connect other end to computer’s keyboard, video, and mouse ports.
c. Place the Z-CIM Terminator in the Z-CIM’s UTP IN port.
d. Power ON computer.
Figure 19 Z-CIM UKVMSC with Local Port