Cisco Systems ASR 1001-X Network Router User Manual


 
3-20
Cisco ASR 1001-X Router Hardware Installation Guide
OL-32376-02
Chapter 3 Preparing Your Site for Installation
Cisco ASR 1001-X Router Installation Checklist
Cisco ASR 1001-X Router Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom,
photocopy the Cisco ASR 1001-X Router Installation Checklist shown in Table 3-8. Use this to record
when each procedure or verification is completed. When the checklist is completed, place it in your site
log along with the other records for your new router.
Table 3-7 Cisco ASR 1001-X Router Shipping Container Contents
Component Description
Chassis Cisco ASR 1001-X Routers are configured with dual AC or dual DC
power supplies and a shared port adapter and NIM blank panel if a shared
port adapter or NIM has not been ordered.
Accessories Kit
Note You must order the
Accessories Kit
separately if you
order the Cisco
ASR 1001-X
Router chassis as a
spare.
Front and rear chassis rack-mount brackets that you will attach to the
chassis with the respective screws
Three sets of screws, one each for:
Front rack-mount brackets (use the black screws)
Rear rack-mount brackets (use the package with the 5 screws)
Cable-management brackets (use the package with the 4 screws)
Two cable-management brackets with U-feature design devices attached.
1 RJ-45 to RJ-45 crossover cable
1 RJ-45 to DB-9 (female) adapter
ESD, Wrist Strap
(disposable)
One disposable wrist strap
Documentation Regulatory Compliance and Safety Information for the Cisco ASR 1000
Series Aggregation Services Routers
Optional Equipment Power cord if an AC power supply was shipped. There are none for the
DC power supply units.
Table 3-8 Cisco ASR 1001-X Router Installation Checklist
Task
Verified
By Date
Date chassis received
Chassis and all accessories unpacked
Types and numbers of interfaces verified
Safety recommendations and guidelines reviewed
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, available