Chapter 2 • Installing the indoor equipment
1031484-0001 Revision 2
27
Post-commissioning
In post-commissioning, you peak the satellite signal, attach the
DW4020 to the customer computer that has a functioning
Ethernet interface, and confirm the customer can surf the Internet.
Peak the satellite signal
1. Unplug the DW4020 power cord from the wall outlet or surge
protector.
2. Remove the phone line and network cable from the installer
laptop PC.
3. Remove the network cable from the Gateway and unplug the
USB cable from the receive modem.
4. Connect a long USB cable from the back of the receive
modem to the installer laptop PC.
5. Assemble and install the satellite antenna.
6. Place the outdoor pointing interface (OPI) in the receive
cable line if applicable.
7. Power on the DW4020.Select
Start→Programs→DIRECWAY
Installer
→Antenna Pointing. The Antenna Pointing - Antenna
Location
screen appears. See Figure 25.
8. Verify the ZIP code matches the antenna location and select
Next. The
Antenna Pointing - Receiver screen appears. Check
the Longitude, Hemisphere, and Frequency values. See
Figure 26.
Figure 25: Antenna Location; verify ZIP code