![](http://pdfasset.owneriq.net/d/be/dbe535a6-ba77-448a-8f8f-6fb9a0f71bd6/dbe535a6-ba77-448a-8f8f-6fb9a0f71bd6-bg5a.png)
Tools and Equipment Required for Installation
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
JUNOSg 3.0 G10 CMTS Hardware Guide
74
Tools and Equipment Required for Installation
You need the following tools to complete the G10 CMTS installation:
! M2.5 Phillips torque screwdriver
! M2.5 flathead torque screwdriver
! M3 Phillips torque screwdriver
! M5 Phillips torque screwdriver
! #10 Phillips torque screwdriver
! #10 flathead torque screwdriver
! #12 Phillips torque screwdriver
! 7/16 in. torque wrench
! 22-10 AWG crimper/cutter/stripper
In addition, you might need the following supplies:
! RF cables and adapters
! Ethernet cables with RJ-45 connectors
You need the following equipment to configure the G10 CMTS and verify that the RF system
has been set up properly:
! PC with asynchronous terminal emulation
! RF spectrum analyzer
! RF power meter