4 Replacement Procedures 4.33 TFT FL (Model 15.0 SXGA+ SHARP LQ150F1LH43)
4-138 Satellite Pro M10 Series Maintenance Manual (960-431)
6. Turn the LCD module upside down.
7. Remove four screws securing the PCBs.
8. Disconnect the FPC.
9. Fold out the PCBs.
Open the connector cover and
disconnect the connector.
Loosen the screws with 0.9kgf
¥
cm of torque.
FPC
Screw
Screw
Screw
Screw
Do not grasp both ends.
Fold out the PCBs as this illustration.
Do not grasp both ends.
Figure 4-108 Folding out the PCBs