4 Replacement Procedures 4.34 TFT FL (Model 15.0 UXGA SHARP LQ150U1LW13)
4-156 Satellite Pro M10 Series Maintenance Manual (960-431)
6. Turn the LCD module upside down.
7. Remove five screws securing the PCBs.
8. Disconnect the FPC.
FPC
Open the connector cover and
disconnect the connector.
Loosen the screws with 1.0kgf
¥
cm of torque.
Screw
Screw
Screw
Screw
Screw
Figure 4-130 Removing five screws and disconnecting the FPC
9. Fold out the PCBs.
Do not grasp both ends.
Fold out the PCBs as this illustration.
Do not grasp both ends.
Figure 4-131 Folding out the PCBs