4 Replacement Procedures 4.33 TFT FL (Model 15.0 SXGA+ SHARP LQ150F1LH43)
4-150 Satellite Pro M10 Series Maintenance Manual (960-431)
14. Install the top frame. Secure the top frame and the lamp cover with six latches.
<Side view>
Top frame
Hook the U-shaped side of the top frame to the P-chassis.
Lay the top frame on the lamp cover. Be sure
the top frame does not interfere with the TCP.
Make sure the top frame meshes with the P-chassis
Make sure the top frame fixes with the P-chassis
Make sure the latches on the top frame mesh with the lamp cover
Figure 4-122 Installing the top frame