ADIC SNC 5100 Network Card User Manual


 
SNC 5100
22 Installation Procedure
6-00020-02
11
Configure the Ethernet Port (Host Name,
Address, Routes, reboot).
Observe Ethernet Link LED.
If you are using the ADIC Management
Console, you must configure an Ethernet
environment.
For more information, see the ADIC
Management Console User Guide
Configure the Ethernet Port using
information in Step 6 in Table 2:
Pre-Installation Checklist.
Refer to Network Setup for the SNC
5100 on page 87.
If the Ethernet Link LED is not on, go to
Ethernet MAP on page 69.
12 Issue hostTypeShow command from
the service terminal to view host type
settings for the Fibre Channel ports.
If the hosts that will be connected are not
the type shown, issue
setHost
command from the service terminal to
set the host type for each Fibre Channel
port.
See the "hostTypeShow" command
on page 138.
See the
"setHost [port],“OS”"
command on page 162.
13
Power down the FC host(s).
Connect the FC cables from the FC
HBA(s) to the SNC 5100.
Power up the FC host(s).
If the FC1 and/or FC2 Connection Status
LED for the attached host(s) is not on,
check FC cables. You may have to change
the polarity of the FC cables. If the
problem persists, go to Fibre Channel
MAP on page 61.
14 Issue the fcShow command from the
service terminal to show the status of the
FC interface that is installed and
connected.
Issue
fcShowDevs command from the
service terminal to show SCSI target
devices that are connected as seen by the
Fibre Channel interface.
See the "fcShow [level]"
command on page 127.
Look for FW State=Ready for each FC
interface. If FW State NOT=Ready, go to
Fibre Channel MAP on page 61.
See the
"fcShowDevs" command on
page 129. If all devices are not shown, go
to SCSI Channel MAP on page 50.
Table 3: Installation Checklist
Step Actions Comments and References