Cisco Systems MDS 9200 Series Switch User Manual


 
Send documentation comments to mdsfeedback-doc@cisco.com
A-5
Cisco MDS 9200 Series Hardware Installation Guide
OL-17468-02
Appendix A Cabinet and Rack Installation
Cisco MDS 9000 Family telco and EIA Shelf Bracket
The rack has sufficient vertical clearance for the chassis plus 2 RU for the shelf brackets, and any
desired clearance for the installation process.
The rack meets the minimum rack load ratings per rack unit listed in the following table:
Before Installing the Shelf Brackets
Before installing the shelf brackets, check the contents of your kit. Table A-1 lists the contents of the
optional shelf bracket kit.
Required Equipment
You need the following equipment for this installation:
Number 2 Phillips screwdriver
Tape measure and level (to ensure shelf brackets are level)
Rack Type MDS 9513 MDS 9509 MDS 9506
MDS 9222i
MDS 9216i
MDS 9216A MDS 9100
EIA (4-Post)
45 lb
(20.41 kg)
45 lb
(20.41 kg)
30 lb
(13.61 kg)
15 lb
(6.8 kg)
7.5 lb
(3.4 kg)
telco (2-Post)
Do not use. Do not use. 60 lb
(27.22 kg)
30 lb
(13.61 kg)
15 lb
(6.8 kg)
Table A-1 Contents of Shelf Bracket Kit
Quantity Part Description
2 Slider brackets
2Shelf brackets
1 Crossbar
2 10-32 x 3/8-inch Phillips pan-head screws
16 12-24 x 3/4-inch Phillips screws
16 10-24 x 3/4-inch Phillips screws