Cisco Systems MDS 9200 Series Switch User Manual


 
Send documentation comments to mdsfeedback-doc@cisco.com
Contents
iii
Cisco MDS 9200 Series Hardware Installation Guide
OL-17468-02
Installing Front Rack-Mount Brackets for Cabinets with Less Than 26 Inches of Rail Spacings 2-14
Installing the Cisco MDS 9200 Series Rear-Facing into Cabinet 2-16
System Grounding 2-19
Proper Grounding Practices 2-19
Preventing Electrostatic Discharge Damage 2-21
Establishing the System Ground 2-23
Required Tools and Equipment 2-23
Grounding the Chassis 2-24
Starting Up the Switch 2-26
Removing and Installing Components 2-28
Removing and Installing Switching and Services Modules 2-28
Removing a Caching Services Module 2-31
Removing Other Switching or Services Modules 2-32
Installing a Switching or Services Module, Including Caching Services Modules 2-33
Verifying Installation of a Switching or Services Module 2-34
Maintaining a Caching Services Module 2-35
Maintaining the Batteries on the Caching Services Module 2-35
Maintaining the Disk Drives on the Caching Services Module 2-35
Removing and Installing Power Supplies 2-36
Removing a Power Supply 2-36
Installing a Power Supply 2-36
Removing and Installing the Fan Module 2-38
Removing a Fan Module 2-39
Installing a Fan Module 2-39
Removing the Cisco MDS 9200 Series 2-40
CHAPTER
3 Connecting the Cisco MDS 9200 Series 3-1
Preparing for Network Connections 3-2
Connecting to the Console Port 3-2
Connecting to the COM1 Port 3-4
Connecting to the MGMT 10/100 Ethernet Port 3-5
Connecting to a Fibre Channel Port 3-6
Removing and Installing X2 Transceivers 3-6
Installing an X2 Transceiver 3-8
Removing an X2 Transceiver 3-8
Removing and Installing SFP Transceivers 3-8
Installing an SFP Transceiver 3-9
Removing an SFP Transceiver 3-10
Removing and Installing Cables into SFP Transceivers 3-11