254
CHAPTER 2 DEPENDENCE FUNCTIONS
2.5.5.1 Operating of sequencer
The sequencer works in the following order.
1) The sequencer starts when the program execution begins.
2) It diverges to the level the shift ahead when the condition consists by setting each level.
3) When the restart condition consists, the sequencer is begun again.
4) When the condition that the level becomes END the shift ahead consists, the sequencer
ends and the break is done.
■ Operating of Sequencer
The sequencer works in the following order. The event can be set as each level and a restart condition.
1) The sequencer starts when the program execution begins.
2) It diverges to the level the shift ahead when the condition consists by setting each level.
3) When the restart condition consists, the sequencer is begun again.
4) When the condition that the level becomes END the shift ahead consists, the sequencer ends and the break
is done.
Note:
When the level the shift ahead has been END, re-execution of the user program will restart the
sequencer.