Fujitsu T5240 Server User Manual


 
120 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009
7. If you are replacing a faulty memory mezzanine assembly, remove the
mezzanine air duct and transfer the FB-DIMMs to the new memory mezzanine
assembly.
Install filler panels in the empty memory mezzanine connector slots, if you are not
replacing the memory mezzanine immediately.
Related Information
“Install a Memory Mezzanine Assembly” on page 120
“Removing Power From the System” on page 60
“Remove the Top Cover” on page 67
Install a Memory Mezzanine Assembly
Caution This procedure requires that you handle components that are sensitive to
static discharge. Static discharges can cause the components to fail.
1. Remove any filler panels from the memory mezzanine connector slots, if
necessary.
Store the filler panels in a safe place. You will reuse the filler panels if you remove
the memory mezzanine assembly in the future.
2. Ensure that the release levers are extended.
3. Lower the memory mezzanine assembly into the chassis.
Ensure that the connectors between the memory mezzanine assembly and the
motherboard are aligned.