168 SPARC Enterprise T5140 and T5240 Servers Service Manual • July 2009
FIGURE: Installing a Power Distribution Board in a SPARC Enterprise T5240 Server
5. (SPARC Enterprise T5240 server) Connect the power supply backplane ribbon
cable to its plug on the power distribution board.
6. Connect the top cover interlock cable to the power distribution board.
7. (SPARC Enterprise T5140 server) Install the power supplies.
8. Slide each power supply into its bay until the power supply locks into place.