128 SPARC Enterprise T5440 Server Service Manual • June 2011
2. Place the IDPROM on an antistatic mat.
▼ Install the IDPROM
Before you begin, complete these tasks:
■ Read the section, “Safety Information” on page 63.
■ Power off the server, using one of the methods described in the section, “Powering
Off the System” on page 67.
■ “Extend the Server to the Maintenance Position” on page 70
■ “Disconnect Power Cords From the Server” on page 68
■ “Perform Electrostatic Discharge – Antistatic Prevention Measures” on page 73
■ “Remove the Top Cover” on page 73
■ “Remove the Service Processor” on page 124