Fujitsu T5440 Server User Manual


 
130 SPARC Enterprise T5440 Server Service Manual June 2011
Install the Battery
1. Place the battery into its holder on the service processor board.
Ensure that the battery is oriented correctly.
2. Press the battery firmly until it snaps into place.
Next Steps
“Install the Service Processor” on page 126
“Install the Top Cover” on page 154
“Slide the Server Into the Rack” on page 155
“Connect the Power Cords to the Server” on page 157
“Power On the Server” on page 157
Servicing the Power Distribution Board
Main 12V power is connected to the motherboard through a bus bar. Standby power
and other control signals are routed through the flex cable circuit to the motherboard.
“Remove the Power Distribution Board” on page 130
“Install the Power Distribution Board” on page 132
Related Information
“Safety Information” on page 63
“Servicing Power Supplies” on page 89
Remove the Power Distribution Board
Before you begin, complete these tasks:
Read the section, “Safety Information” on page 63.
Power off the server using one of the methods described in the section, “Powering
Off the System” on page 67.
“Disconnect Power Cords From the Server” on page 68
“Extend the Server to the Maintenance Position” on page 70
“Remove a Power Supply” on page 92