Paradyne CPX-1000 Network Card User Manual


 
3. Installing the CPX-1000 1000-A2-GN22-00
3-2 February 2003
Installation
Checklist
Photocopy or print these pages as quick reference to the steps
required for successful installation and turn up.
Task
Page Ref
Prepare for Installation (safety information, site preparation)
3-5
Unpack and inspect the CPX
3-10
Inventory CPX components
3-11
Attach mounting flanges
3-12
Mount CPX in rack
(optionally mount Splitter Assembly)
3-13
3-16
Connect plant battery and frame ground to CPX shelf
3-16
Install modules (cards) in CPX
3-19
Attach OC-3 ATM network cables
3-24
Verify hardware installation, (power, ground, and cards)
3-23
Attach Ethernet cables, MP to CP cards, and CPX to LAN
3-25
Attach CP redundancy cable
3-25
Connect CPX to Class 5 switch (Octal T1)
3-26
Connect CPX to Class 5 switch (12-port T1)
3-28
Attach STS-1 Cables
3-30