Configuring the Converged Network Analyzer Application
Issue 5 October 2007 163
Test Plug 1
Administrative State
Administrative status of the test plug. Possible values are:
● Enable
● Disable
Test Plug 1 Status The status of the Test Plug operation. Possible values include:
● Unregistered - The test plug is attempting to register and is
currently unregistered.
● Scheduler List Exhausted - The test plug has exhausted its
scheduler list at least once, and is now attempting to register.
● Idle - The test plug is registered, but idle.
● Test - The test plug is running a test.
● Suspend - The test plug is idle because a test was cancelled.
● No IP Address - No IP address is configured for the test plug
interface.
● Bad IP Address - The configured test plug IP address is not
properly configured for the test plug interface.
● Empty Scheduler List - The scheduler list is empty. No
testing events were configured for this device.
● Failed Control Port Bind - The test plug failed to bind the
UDP control port.
● Failed FTP Port Bind - The test plug failed to bind to the UDP
port for RTP tests.
● Suspend By Rate Limiter - The test plug was suspended by
its test rate limiter.
Table 60: CNA Configuration - Test Plug Parameters (continued)
Field Description
2 of 2