Q-Logic QLA2342 Switch User Manual


 
B – Command Line Interface
Hotswap Command
59043-06 A B-23
0
Which IO blade (indexed by slot number) do you want
to replace? (1,2,3,4,6,7,8,9): [1] 6
o Remove all connections from the IO blade in slot 6.
o Remove the IO blade in slot 6 from the chassis.
Have the above operations been completed? (y = proceed / n = cancel) y
Hotswap IO blade removal sub-procedure successfully completed.
If you wish to continue with the replacement procedure please note
that after the blade has been successfully inserted:
o Diagnostics will be performed on the IO blade.
o The diagnostics results will be posted.
o The IO blade will be initialized to its configured state.
o All ports on the blade will be initialized to their configured state.
Do you want to continue with the replacement procedure? (y=proceed/n=cancel) y
o Insert the replacement IO blade into the chassis in slot 6.
o Attach all connections, if any, to the IO blade in slot 6.
Have the above operations been completed? (y = proceed / n = cancel) y
Hotswap IO blade process successfully completed.
Diagnostics has been run on the IO blade in slot 6: Passed
WARNING: Multiple alarms were posted during this process.
Execute the 'show alarm' command to see all alarms.
SANbox2 (admin) #>
Alarm Msg: [9][day month date time year][A3015.0001][SM][I/O blade in slot 6 has
been inserted