Configuring Mesh Networking
9-19
1. The Trion IT department verifies connectivity with both of the AP-5131s following the
instructions in Testing Connectivity on page 3-13.
2. The Trion IT Department installs the AP1 on a wall with the antennas orienting outward into
the shipping and receiving yard. The team then installs the AP2 on a wall on the receiving
shack in the shipping yard.
The Trion IT department follows the instructions in
Wall Mounted Installations on page 2-13 to install AP1 and AP2.
AP1
AP2