DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration
555-233-124
Issue 1
April 2000
Administering ATM-PNC and ATM-CES
5-34Final Checklist and Test
5
Final Checklist and Test
After you complete all the administration, you might want to run through a final
checklist and verify that everything is working. This section contains a final
installation checklist and a procedure for testing the installation.
Use Table 5-13
to make sure that the switch administration for both the ATM and
DEFINITY ECS switches is complete. Use Table 5-14
and Table 5-15 to test the
ATM-PNC and ATM-CES installations, respectively.
Table 5-13. Final installation checklist
√
Switch
administration What to check How to check
ATM 1. A VPI or VCI is administered for each CES PVC Query ATM switch
2. Class of service is Constant Bit Rate (CBR) Query ATM switch
3. Quality of Service (QoS) is Peak Cell Rate
(PCR)
Query ATM switch
DEFINITY ECS
switch
1. ATM circuit packs inserted and translated Query DEFINITY ECS (list
configuration atm)
2. Signaling group
for each PVC
a. Signaling group
identifier
b. Circuit pack ID
c. VPI/VCI
d. VC type is PVC
e. D-channel port
number
assigned
properly
f. Signaling type
(CES)
administered
g. Minimum
number of
channels
administered
(total of 7, at
least 1 must be a
D channel)
h. D- and
B-channel-to-por
t mapping
Query DEFINITY ECS (status
signaling group)
3. PVCs are up Query DEFINITY ECS (status
signaling-group n). If
signaling group is in service,
then PVCs are up.
ATM-PNC 1. ATM circuit packs installed and translated Query DEFINITY ECS
Continued on next page