Lucent Technologies Comcode 108678723 Server User Manual


 
DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration
555-233-124
Issue 1
April 2000
Upgrading to ATM-PNC
4-19R7r ATM-PNC to R8r ATM-PNC
4
10. Remove old ATM
circuit packs
Remove old, A-PNC TN2238 circuit
packs.
NOTE:
Carefully remove the fiber
connections to the ATM circuit
packs.
11. Insert ATM circuit
packs
Insert A-PNC TN2305/TN2306 circuit
packs.
12. Connect fiber to
A-PNC ATM circuit
packs
Physically connect (reterminate) fiber to
all A-PNC ATM circuit packs
13. Administer A-PNC
ATM circuit packs
change
circuit-packs n
(cabinet number)
Administer A-PNC ATM circuit pack Y
14. Administer ILMI/ESI
information
change atm pnc n
(connection
number)
Change the new ESI (board) address in
the
ESI
field for each B-PNC ATM
circuit pack.
Query the ATM switch. Read the
address information from the ATM
terminal screen and duplicate in the
DEFINITY ECS switch administration.
Y
Screen
4-4
15. Verify circuit pack
insertion
list configuration
atm
Ensure that all new A-PNC ATM circuit
packs are listed in the report.
16. Release atm
connection
release atm pnc n Release all of the atm connections that
were busied out in step 10.
Table 4-6. Upgrading ATM-PNC from Release 6.3r to Release 8r Standard and High Reliability Continued
÷ Step Action Command Description Time
Record
data
More
info Site-specific comments
Continued on next page