Lucent Technologies Comcode 108678723 Server User Manual


 
DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration
555-233-124
Issue 1
April 2000
Administering ATM-PNC and ATM-CES
5-36Final Checklist and Test
5
Table 5-15. ATM-CES installation test procedure
What to check How to check How to fix
1. Check SONET/SDH layer
for status and alarms.
2. Check the LEDs on the
ATM circuit packs
Refer to the maintenance book
for descriptions of the LEDs,
their flash rates, and the
conditions indicated.
3. Temporarily disable any call
overflows through
administration across each
CES trunk group.
Place test call to any EPN
remoted through each signaling
group. Make sure call
completes and has a 2-way talk
path.
4. Ensure CDR records
properly, if enabled
5. Verify that ISDN features
are working
Continued on next page