Lucent Technologies Comcode 108678723 Server User Manual


 
DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration
555-233-124
Issue 1
April 2000
Installing a DEFINITY ECS ATM-PNC
3-23Synchronization Installation and Testing
3
6.
Reconnect the
cable
Connect the H600-383 cable to the smart jack or dumb
block.
1. For more information about Smart Jack CPE Testing, see DEFINITY ECS Release 8
Maintenance for R8r, Chapter 6, “DS1 CPE Loopback Jack Installation and Operations
Instructions.”
Table 3-10. The 120A ICSU test procedure — Continued
Step Action Command Description
Continued on next page