DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration
555-233-124
Issue 1
April 2000
Index
IN-4
R
reliability
ATM network duplication, 3-32
reliability configurations, parts required for, 1-4
RLB, 3-28
S
security issues, xii
SVC cache administration, 5-30
switch suitability
known switch limits
, 1-13
switched virtual connection, 1-9
synchronization
network
, 3-3
synchronization connections
directly to timing source, 3-11
through a DSU/CSU, 3-11
through an ICSU, 3-11
synchronization splitters, 3-4
400A T1, 3-5, 3-6, 3-11, 3-12
401A T1, 3-5, 3-7, 3-13
402A E1, 3-5, 3-8, 3-13
403A E1, 3-5, 3-9, 3-13
connected through a DSU/CSU, 3-24
connected through an ICSU, 3-21
DTE loopback procedure, 3-27
E1, 1-4
for specific countries, 3-15
installing 400A T1, 3-20
jumper settings
401A T1, 3-10
T1, 1-4
testing, 3-19
system capacities, 1-5
T
test equipment
103A block
, 1-4, 3-22
15411C cable kit, 1-4
700A DS1 CPE loopback jack, 1-4, 3-22, 3-24
Phoenix 1541C Test Set, 1-4
Phoenix 5575A T1 Test Set, 1-4