Allied Telesis AT-9000/28POE Switch User Manual


  Open as PDF
of 1480
 
9
Preface
This is the command line management guide for the AT-9000/12POE,
AT-9000/28, AT-9000/28POE, AT-9000/28SP, and AT-9000/52 Managed
Layer 2-4 Gigabit Ethernet EcoSwitches. The instructions in this guide
explain how to start a management session and how to use the commands
in the AlliedWare Plus command line interface to view and configure the
features of the switch.
For hardware installation instructions, refer to the AT-9000 Manager Layer
2 Fast Ethernet EcoSwitch Series Installation Guide.
This preface contains the following sections:
“Document Conventions” on page 10
“Where to Find Web-based Guides” on page 11
“Contacting Allied Telesis” on page 12
Caution
The customer, re-seller, sub-contractor, distributor, software
developer or any buyer of an Allied Telesis “ATI” product known as
“customer”, hereby agrees to have all licenses required by any
governmental agency and to comply with all applicable laws and
regulations in its performance under this Agreement, including
export control, maintained by U.S. Commerce Department’s Bureau
of Industry and Security (BIS) and the U.S. Treasury Department’s
Office of Foreign Assets Control (OFAC), international boycotts
regulations and all anti-corruption laws, including the U.S. Foreign
Corrupt Practices Act (FCPA). The customer understands that U.S.
Government authorization may be required to export the software,
commodity or technology, or to re-export or re-transfer to a third
country, another end-user or another end-use. The customer agrees
to assume all such obligations.