Fujitsu M8000 Server User Manual


 
13-20 SPARC Enterprise M8000/M9000 Servers Service Manual June 2010
b. If the lever stops halfway even when the PCI cassette is inserted again, pull
the PCI cassette out from the IOU, and then check whether the PCI card is
set in the normal position (see a, b and c of Step 8). Then, reinsert the PCI
cassette.
Caution – Do not forcibly push the lever of the PCI cassette when the lever is
pushed but stops halfway. In this case, restore the lever to its original position, and
then reinsert it. If the lever stops halfway even when the PCI cassette is inserted
again, it is possible that the PCI card is not set in the normal position (see a, b and c
of Step 7). Pull the PCI cassette out from the IOU, check the position of the PCI card,
and then reinsert it.
10. Turn on power to the relevant domain.
From a console that is connected to XSCF, execute the poweron -d command of
XSCF.
The power to all the domains is turned on, and then the power-on self test (POST)
is executed. When ok prompt displayed on the console of relevant domain, POST
is completed.
For details of the power-on operation, see Section 4.4.2, “Powering the Server On”
on page 4-19, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000
Servers XSCF User’s Guide.
11. Close the door on the server, and lock it.
13.4 Cold Replacement
In cold replacement, none of the replacement work is performed with the
maintenance menu from a terminal connected to XSCF.
The procedure is as follows.
1. Unlock and open a door of the server.
For details, see Chapter 5.
Caution – Before touching FRU or the dummy (filler) unit, see Section 1.4,
“Antistatic Precautions” on page 1-6 and be sure to wear the antistatic wrist strap.
Failure to do so might result in serious damage to operating domains.