24-16 SPARC Enterprise M8000/M9000 Servers Service Manual • June 2010
FIGURE 24-11 M9000 Expansion Cabinet + Power Cabinet
24.3 Addition and Deletion of M9000
Expansion Cabinet
The procedure listed below can be used. For details, see the power cabinet
installation procedure explained in the SPARC Enterprise M8000/M9000 Servers
Installation Guide.
■ Adding or deleting an M9000 expansion cabinet for the M9000 base cabinet
FIGURE 24-12 shows an installation diagram of the cabinets.
Power cabinet
Power cabinet