Pelco C1566M-C Switch User Manual


 
C1572M (9/05) 77
VIEWING MULTI-NODE SYSTEM STATUS
The CM9700-NW1 provides a diagnostic screen that displays multi-node system status during the initialization of the CM9700-NW1 and any
changes in system status that occur after the initialization process. Refer to Figure 37 for a sample CM9700-NW1 diagnostic screen.
Figure 37. Sample CM9700-NW1 Diagnostic Screen
As the CM9700-NW1 initializes, the SERCOM ports of the CM9700-NW1 are set up according to the CM9700-NW1 configuration file.
The CM9700-NW1 then polls each of the SERCOM ports and requests download information about the setup of each port. As shown in
Figure 37, the CM9700-NW1 diagnostic screen displays the hardware configuration of the CM9700-NW1 and then displays the downloaded
information about each of the SERCOM ports connected to a CM9700-CC1 as each port is polled. The CM9700-NW1 reports that a port is online
(for example, port 8 is online) and displays the status of setup information for the port (for example, received operator parameters). In addition,
date and time information is also displayed for each status condition. The CM9700-NW1 continues to poll until each port connected to a
CM9700-CC1 has responded with the download information. The diagnostic screen also indicates when the CM9700-MGR PC, referred to as the
Admin PC, goes online.
The CM9700-NW1 diagnostic screen changes only when a change in system status occurs. For example, if port 8 is online (as shown in
Figure 37) but then goes offline, the diagnostic screen then displays the offline condition including the date and time of the occurrence:
Fri Jul 24 15:23:13 2005 Port 8 off line
When port 8 goes online, the diagnostic screen then displays the online condition including the date and time of the occurrence:
Fri Jul 24 16:20:23 2005 Port 8 on line
The diagnostic screen also indicates a change in status of the CM9700-MGR PC. For example, the diagnostic screen displays the following when
the CM9700-MGR PC goes offline and then back online:
Fri Jul 23 16:21:32 2005 Admin PC off line
Fri Jul 23 16:30:24 2005 Admin PC on line
PELCO CM9700 N.I.U. Ver xxx xxx
Vector initialized
2nodes.niu
Com init COM1
ATNRQ 3 (IRQ 5) Connected to _ _ _ _
ATNRQ 4 (IRQ 10) Connected to SER 1
ATNRQ 6 (IRQ 11) Connected to SER 2
ATNRQ 7 (IRQ 12) Connected to SER 3
ATNRQ 5 (IRQ 7) Connected to _ _ _ _
ATNRQ 2 (IRQ 4) Connected to COM 1
ATNRQ 1 (IRQ 3) Connected to _ _ _ _
ATNRQ 0 (IRQ 15) Connected to _ _ _ _
Fri Jul 23 11:46:10 2005 Port 8 Request download
Fri Jul 23 11:46:11 2005 Port 8 on line
Fri Jul 23 11:47:13 2005 Port 8 Receiving Monitor parameters
Fri Jul 23 11:47:16 2005 Port 8 Receiving Camera parameters
Fri Jul 23 11:47:17 2005 Port 8 Received Tie Line parameters
Fri Jul 23 11:47:18 2005 Port 8 Received Operator parameters