Powerware 100160 kVA Power Supply User Manual


 
Installing the UPS System
3-14
EATON Powerware
®
9390 UPS (100–160 kVA) Installation and Operation Manual S 164201604 Rev B powerware.com
6. When all wiring is complete, reinstall the safety shield panels removed in previous
steps. Secure with the retained hardware.
7. Close the control panel door and secure with the retained hardware.
8. Reinstall the doors removed previously and secure w ith the retained hardware.
9. Close the doors and secure the latch.
10. Refer to the manual supplied with the X-Slot card for operator instructions.
3.2.8 Installing Accessories and Parallel System Control Wiring
To install an optional Remote Emergency Power-off C ontrol, see Chapter 5, “Installing a
Remote Emergency Power-off Control.” To install optional accessories, see Chapter 6,
“Installing Options and Accessories.” To install parallel system control wiring, see Chapter 6,
“Installing Options and Accessories.”
3.3 Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page W-1 become void. This service is
offeredaspartofthesalescontractfortheUPS.Contactserviceinadvance(usuallya
two-week notice is required) to reserve a preferred startup date.
3.4 Completing the Installation Checklist
The final step in installing the UPS system is completing the following Installation Checklist.
This checklist ensures that you have completely installed all hardware, cables, and other
equipment. Complete all items listed on the checklist to ensure a smooth installation. Make
a copy of the Installation Checklist before filling it out, and retain the original. If installing a
parallel system, complete the Parallel System Installation Checklist in addition to the
Installation Checklist.
After the installation is complete, your Eaton service representative must verify the
operation of the UPS system and commission it to support the critical load. The service
representative cannot perform any installation tasks other than verifying software and
operating setup parameters. Service personnel may request a copy of the completed
Installation Checklist to verify all applicable equipment installations h ave been completed.
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system
for the first time.